Assessment Year | 2019 |
---|---|
Principal Product | Electrical Connectors |
NAICS | 334417: Electronic Connector Manufacturing |
SIC | 3694: Electrical Equipment for Internal Combustion Engines |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
80,000
ft2
|
Annual Production | 13,200,000
pieces
|
Production Hrs. Annual | 6,888
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $259,630 | 3,969,600 |
kWh
|
$0.065 | |
Electricity Demand | $78,050 | 9,611 |
kW-mo/yr
|
$8.12 | |
Natural Gas | $8,686 | 1,048 |
MMBtu
|
$8.29 | |
Waste Disposal Costs | |||||
Water Usage | $7,339 | 2,680,200 |
Tgal
|
$0.003 | |
Water Disposal | $13,534 | 2,680 |
Tgal
|
$5.05 | |
TOTAL YEARLY COSTS | $367,239 | ||||
RECOMMENDED SAVINGS* | $94,067 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $61,196 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.812: Apply for investment incentives | $61,196 | $11,500 | - | - | - | $61,196 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $24,037 | $53,169 |
$19,702
301,260
kWh
|
$4,335
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,576 | $3,500 |
$5,485
83,866
kWh
|
$1,091
-
kW-mo/yr
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,140 | $3,390 |
$937
14,330
kWh
|
$203
-
kW-mo/yr
|
- | - | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $1,118 | $1,900 | - | - |
$1,118
-
Tgal
|
- | |
TOTAL RECOMMENDED | $94,067 | $73,459 |
$26,124
399,456
kWh
|
$5,629
-
kW-mo/yr
|
$1,118
-
Tgal
|
$61,196 | ||
TOTAL IMPLEMENTED | $61,196 | $11,500 | - | - | - | $61,196 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs