ITAC Assessment: TT0225
ITAC logo
ITAC Assessment: TT0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Electrical Connectors
NAICS 334417: Electronic Connector Manufacturing
SIC 3694: Electrical Equipment for Internal Combustion Engines
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 80,000
ft2
Annual Production 13,200,000
pieces
Production Hrs. Annual 6,888
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $259,630 3,969,600
kWh
Electricity Demand $78,050 9,611
kW-mo/yr
Natural Gas $8,686 1,048
MMBtu
Waste Disposal Costs
Water Usage $7,339 2,680,200
Tgal
Water Disposal $13,534 2,680
Tgal
TOTAL YEARLY COSTS $367,239
RECOMMENDED SAVINGS* $94,067 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $61,196

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 4.812: Apply for investment incentives $61,196 $11,500 - - - $61,196
02 2.7142: Utilize higher efficiency lamps and/or ballasts $24,037 $53,169 $19,702
301,260
kWh
$4,335
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,576 $3,500 $5,485
83,866
kWh
$1,091
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,140 $3,390 $937
14,330
kWh
$203
-
kW-mo/yr
- -
05 3.4116: Meter recycled water (to reduce sewer charges) $1,118 $1,900 - - $1,118
-
Tgal
-
TOTAL RECOMMENDED $94,067 $73,459 $26,124
399,456
kWh
$5,629
-
kW-mo/yr
$1,118
-
Tgal
$61,196
TOTAL IMPLEMENTED $61,196 $11,500 - - - $61,196
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs