Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

140

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Primary batteries, dry and wet
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1134 #04 Y:2024 Change method of deionized water production $257,299 $103,000
OK1134 #03 Y:2024 Recharge batteries on during off-peak demand periods $11,172 -
OK1134 #02 Y:2024 Use solar heat to make electricty $100,152 $858,000
OK1134 #01 Y:2024 Install occupancy sensors $262 -
SU0476 #06 Y:2018 Eliminate/reduce an operation $5,095 $4,500
SU0476 #05 Y:2018 Install compressor air intakes in coolest locations $1,955 $1,607
SU0476 #04 Y:2018 Install occupancy sensors $803 $433
SU0476 #03 Y:2018 Reduce ventilation air $3,103 $894
SU0476 #02 Y:2018 Install vinyl strip / high speed / air curtain doors $1,702 $131
SU0476 #01 Y:2018 Disconnect ballasts $216 -
MZ0237 #08 Y:2017 Lower temperature during the winter season and vice-versa $22,338 -
MZ0237 #07 Y:2017 Utilize energy-efficient belts and other improved mechanisms $69 -
MZ0237 #06 Y:2017 Reduce the pressure of compressed air to the minimum required $5,362 $25,000
MZ0237 #05 Y:2017 Recover waste heat from equipment $36,123 $11,000
MZ0237 #04 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $599 $50
MZ0237 #03 Y:2017 Reduce illumination to minimum necessary levels $7,548 -
MZ0237 #02 Y:2017 Install occupancy sensors $262 $800
MZ0237 #01 Y:2017 Reduce illumination to minimum necessary levels $3,793 -
IP0085 #09 Y:2017 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $448,362 $2,150,000
IP0085 #08 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $989 $804