ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SJ0029 #06 Y:2024 | 06 | 2024 | Change rate schedules or other changes in utility service | $10,952 | - |
n/a
|
SJ0029 #05 Y:2024 | 05 | 2024 | Insulate bare equipment | $378 | $574 |
n/a
|
SJ0029 #04 Y:2024 | 04 | 2024 | Install vinyl strip / high speed / air curtain doors | $2,874 | $6,782 |
n/a
|
SJ0029 #03 Y:2024 | 03 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $78 | - |
n/a
|
SJ0029 #02 Y:2024 | 02 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,400 | $1,940 |
n/a
|
SJ0029 #01 Y:2024 | 01 | 2024 | Use solar heat to make electricty | $137,645 | $376,457 |
n/a
|
OR0790 #03 Y:2024 | 03 | 2024 | Eliminate or reduce compressed air usage | $120 | $116 |
n/a
|
OR0790 #02 Y:2024 | 02 | 2024 | Use solar heat to make electricty | $12,196 | $107,553 |
n/a
|
OR0790 #01 Y:2024 | 01 | 2024 | Contract a wood pallet recycling company | $19,663 | - |
n/a
|
LE0464 #05 Y:2018 | 05 | 2018 | Replace existing hvac unit with high efficiency model | $2,187 | $12,000 | |
LE0464 #04 Y:2018 | 04 | 2018 | Utilize higher efficiency lamps and/or ballasts | $8,809 | $23,000 | |
LE0464 #03 Y:2018 | 03 | 2018 | Convert combustion equipment to burn natural gas | $10,836 | $28,000 | |
LE0464 #02 Y:2018 | 02 | 2018 | Reduce the pressure of compressed air to the minimum required | $114 | $40 | |
LE0464 #01 Y:2018 | 01 | 2018 | Turn off equipment when not in use | $214 | $40 | |
MI0321 #10 Y:2017 | 10 | 2017 | Lower temperature during the winter season and vice-versa | $766 | $400 | |
MI0321 #09 Y:2017 | 09 | 2017 | Insulate bare equipment | $1,612 | $1,914 | |
MI0321 #08 Y:2017 | 08 | 2017 | Use adjustable frequency drive or multiple speed motors on existing system | $2,121 | $1,508 | |
MI0321 #07 Y:2017 | 07 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,256 | $1,660 | |
MI0321 #06 Y:2017 | 06 | 2017 | Optimize plant power factor | $3,370 | $10,745 | |
MI0321 #05 Y:2017 | 05 | 2017 | Change rate schedules or other changes in utility service | $5,988 | $6,400 |