Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

159

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electronic coils, transformers, and other inductors
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0029 #06 Y:2024 Change rate schedules or other changes in utility service $10,952 -
SJ0029 #05 Y:2024 Insulate bare equipment $378 $574
SJ0029 #04 Y:2024 Install vinyl strip / high speed / air curtain doors $2,874 $6,782
SJ0029 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $78 -
SJ0029 #02 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,400 $1,940
SJ0029 #01 Y:2024 Use solar heat to make electricty $137,645 $376,457
OR0790 #03 Y:2024 Eliminate or reduce compressed air usage $120 $116
OR0790 #02 Y:2024 Use solar heat to make electricty $12,196 $107,553
OR0790 #01 Y:2024 Contract a wood pallet recycling company $19,663 -
LE0464 #05 Y:2018 Replace existing hvac unit with high efficiency model $2,187 $12,000
LE0464 #04 Y:2018 Utilize higher efficiency lamps and/or ballasts $8,809 $23,000
LE0464 #03 Y:2018 Convert combustion equipment to burn natural gas $10,836 $28,000
LE0464 #02 Y:2018 Reduce the pressure of compressed air to the minimum required $114 $40
LE0464 #01 Y:2018 Turn off equipment when not in use $214 $40
MI0321 #10 Y:2017 Lower temperature during the winter season and vice-versa $766 $400
MI0321 #09 Y:2017 Insulate bare equipment $1,612 $1,914
MI0321 #08 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $2,121 $1,508
MI0321 #07 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $2,256 $1,660
MI0321 #06 Y:2017 Optimize plant power factor $3,370 $10,745
MI0321 #05 Y:2017 Change rate schedules or other changes in utility service $5,988 $6,400