ITAC Assessment: SJ0029
ITAC logo
ITAC Assessment: SJ0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Electronic Coil, Transformer, and Other Inductor Manufacturing
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3677: Electronic Coils, Transformers, and Other Inductors
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 22,000
ft2
Annual Production 80,000
units
Production Hrs. Annual 2,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $148,950 358,216
kWh
Natural Gas $6,608 299
MMBtu
TOTAL YEARLY COSTS $155,558
RECOMMENDED SAVINGS* $153,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings
01 2.9114: Use solar heat to make electricty $137,645 $376,457 $137,645
330,878
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,400 $1,940 $1,400
3,366
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $78 - $78
187
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,874 $6,782 $2,874
6,909
kWh
-
05 2.2511: Insulate bare equipment $378 $574 $378
908
kWh
-
06 2.8114: Change rate schedules or other changes in utility service $10,952 - - $10,952
TOTAL RECOMMENDED $153,327 $385,753 $142,375
342,248
kWh
$10,952
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs