ITAC Assessment: OR0790
ITAC logo
ITAC Assessment: OR0790
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product mineral oil base stock, steel, specialty steel. aluminum, copper
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3677: Electronic Coils, Transformers, and Other Inductors
Sales Range $10
M
to 50
M
# of Employees 43
Plant Area 32,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,454 367,254
kWh
Electricity Demand $27,602 2,636
kW-mo/yr
Electricity Fees $4,693 -
Natural Gas $39,433 5,056
MMBtu
Fuel Oil #1 $404 13
MMBtu
Waste Disposal Costs
Water Usage $1,983 208
Tgal
Other Liquid (non-haz) $5,901 1
gal
TOTAL YEARLY COSTS $107,470
RECOMMENDED SAVINGS* $31,979 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings
01 3.5316: Contract a wood pallet recycling company $19,663 - - - $404
-
MMBtu
$19,259
02 2.9114: Use solar heat to make electricty $12,196 $107,553 $8,204
112,411
kWh
$3,992
-
kW-mo/yr
- -
03 2.4239: Eliminate or reduce compressed air usage $120 $116 $120
1,618
kWh
- - -
TOTAL RECOMMENDED $31,979 $107,669 $8,324
114,029
kWh
$3,992
-
kW-mo/yr
$404
-
MMBtu
$19,259
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs