Assessment Year | 2024 |
---|---|
Principal Product | mineral oil base stock, steel, specialty steel. aluminum, copper |
NAICS | 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3677: Electronic Coils, Transformers, and Other Inductors |
Sales Range | $10 M to 50M |
# of Employees | 43 |
Plant Area |
32,000
ft2
|
Annual Production | 35,000,000
lb
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $27,454 | 367,254 |
kWh
|
$0.075 | |
Electricity Demand | $27,602 | 2,636 |
kW-mo/yr
|
$10.47 | |
Electricity Fees | $4,693 | - |
|
- | |
Natural Gas | $39,433 | 5,056 |
MMBtu
|
$7.80 | |
Fuel Oil #1 | $404 | 13 |
MMBtu
|
$31.08 | |
Waste Disposal Costs | |||||
Water Usage | $1,983 | 208 |
Tgal
|
$9.53 | |
Other Liquid (non-haz) | $5,901 | 1 |
gal
|
$5,901.00 | |
TOTAL YEARLY COSTS | $107,470 | ||||
RECOMMENDED SAVINGS* | $31,979 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 3.5316: Contract a wood pallet recycling company | $19,663 | - | - | - |
$404
-
MMBtu
|
$19,259 | |
02 | 2.9114: Use solar heat to make electricty | $12,196 | $107,553 |
$8,204
112,411
kWh
|
$3,992
-
kW-mo/yr
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $120 | $116 |
$120
1,618
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $31,979 | $107,669 |
$8,324
114,029
kWh
|
$3,992
-
kW-mo/yr
|
$404
-
MMBtu
|
$19,259 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs