Assessment Year | 1996 |
---|---|
Principal Product | Framed Art, Accessories, and Lamps |
NAICS |
n/a
|
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 90 |
Plant Area |
104,000
ft2
|
Annual Production | 40,000
pieces
|
Production Hrs. Annual | 2,998
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $77,786 | 977,726 |
kWh
|
$0.080 |
Electricity Demand | $15,904 | 4,203 |
kW-mo/yr
|
$3.78 |
Natural Gas | $4,833 | 994 |
MMBtu
|
$4.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,999 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $714 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $714 | $299 |
$595
7,327
kWh
|
$119
-
kW-mo/yr
|
- | - | |
02 | 2.7111: Reduce illumination to minimum necessary levels | $1,338 | $440 |
$1,019
12,603
kWh
|
$319
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $631 | $200 |
$503
6,741
kWh
|
$128
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $333 | $70 |
$265
3,224
kWh
|
$68
-
kW-mo/yr
|
- | - | |
05 | 2.7444: Close holes and openings in building such as broken windows | $3,574 | $3,000 |
$3,574
44,549
kWh
|
- | - | - | |
06 | 3.8142: Distill contaminated solvents for reuse | $11,265 | $11,000 | - | - |
$11,265
-
gal
|
- | |
07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $24,144 | $1,000 | - | - | - |
$24,144
-
lb
|
|
TOTAL RECOMMENDED | $41,999 | $16,009 |
$5,956
74,444
kWh
|
$634
-
kW-mo/yr
|
$11,265
-
gal
|
$24,144
-
lb
|
||
TOTAL IMPLEMENTED | $714 | $299 |
$595
7,327
kWh
|
$119
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs