Assessment Year | 2022 |
---|---|
Principal Product | Injection Molding / Glass |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 90 |
Plant Area |
98,000
ft2
|
Annual Production | 867,775
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,435 | 1,974,155 |
kWh
|
$0.054 |
Electricity Demand | $29,104 | 5,460 |
kW-mo/yr
|
$5.33 |
Electricity Fees | $4,353 | - |
|
- |
Natural Gas | $9,380 | 1,329 |
MMBtu
|
$7.06 |
TOTAL YEARLY COSTS | $149,272 | |||
RECOMMENDED SAVINGS* | $6,740 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $55 | - |
$43
804
kWh
|
$12
-
kW-mo/yr
|
- | |
02 | 2.2511: Insulate bare equipment | $1,123 | $714 |
$874
16,224
kWh
|
$249
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $306 | $202 |
$215
3,994
kWh
|
$61
-
kW-mo/yr
|
$30 | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,423 | $5,000 |
$1,107
20,552
kWh
|
$316
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $875 | $316 |
$868
16,112
kWh
|
$247
-
kW-mo/yr
|
$(-240.0) | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,654 | $50 |
$1,275
23,752
kWh
|
$379
-
kW-mo/yr
|
- | |
07 | 2.2612: Use cooling tower water instead of refrigeration | $1,304 | $2,369 |
$857
15,913
kWh
|
$447
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $6,740 | $8,651 |
$5,239
97,351
kWh
|
$1,711
-
kW-mo/yr
|
$(-210.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs