ITAC Assessment: WI0004
ITAC logo
ITAC Assessment: WI0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CONTROL CIRCUITS
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $1
M
to 5
M
# of Employees 90
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,179 888,042
kWh
Natural Gas $4,530 792
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,270 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,926

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4312: Improve lubrication practices $448 - $448
5,862
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $224 - $224
2,931
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,551 $549 $1,551
20,516
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,838 $13,000 $15,995
211,606
kWh
$(-5,157.0)
-
MMBtu
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $282 $842 $415
5,569
kWh
$(-133.0)
-
MMBtu
06 2.7447: Install vinyl strip / high speed / air curtain doors $927 $2,100 - $927
-
MMBtu
TOTAL RECOMMENDED $14,270 $16,491 $18,633
246,484
kWh
$(-4,363.0)
-
MMBtu
TOTAL IMPLEMENTED $2,926 $2,649 $1,999
26,378
kWh
$927
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs