ITAC Assessment: LE0464
ITAC logo
ITAC Assessment: LE0464
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Coils
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3677: Electronic Coils, Transformers, and Other Inductors
Sales Range $5
M
to 10
M
# of Employees 18
Plant Area 38,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 2,340
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,009 514,085
kWh
Electricity Demand $21,804 1,649
kW-mo/yr
Electricity Fees $16,717 -
Fuel Oil #2 $20,780 995
MMBtu
TOTAL YEARLY COSTS $104,310
RECOMMENDED SAVINGS* $22,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $214 $40 $214
2,425
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $114 $40 $48
547
kWh
$66
-
kW-mo/yr
-
03 2.1332: Convert combustion equipment to burn natural gas $10,836 $28,000 - - $10,836
04 2.7142: Utilize higher efficiency lamps and/or ballasts $8,809 $23,000 $5,478
62,244
kWh
$3,331
-
kW-mo/yr
-
05 2.7232: Replace existing hvac unit with high efficiency model $2,187 $12,000 $1,235
14,040
kWh
$952
-
kW-mo/yr
-
TOTAL RECOMMENDED $22,160 $63,080 $6,975
79,256
kWh
$4,349
-
kW-mo/yr
$10,836
TOTAL IMPLEMENTED $22,160 $63,080 $6,975
79,256
kWh
$4,349
-
kW-mo/yr
$10,836
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs