| Assessment Year | 2008 |
|---|---|
| Principal Product | Latex Paint |
| NAICS | 325510: Paint and Coating Manufacturing |
| SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
| Sales Range | $50 M to 100M |
| # of Employees | 105 |
| Plant Area |
68,000
ft2
|
| Annual Production | 4,627
Tgal
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Maryland |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $161,162 | 4,060,276 |
kWh
|
$0.040 |
| Natural Gas | $41,225 | 3,104 |
MMBtu
|
$13.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $354,946 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $236,566 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4224: Upgrade controls on compressors | $214,300 | $95,000 |
$(-8,200.0)
(-8,200)
kWh
|
$240,000
-
gal
|
$(-17,500.0)
-
lb
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $70,880 | $12,500 |
$70,880
581,000
kWh
|
- | - | |
| 03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $22,266 | $7,720 |
$22,266
182,512
kWh
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $15,891 | $281 |
$15,891
130,253
kWh
|
- | - | |
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $14,324 | $465 |
$14,324
117,412
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $10,221 | $2,413 |
$10,221
83,779
kWh
|
- | - | |
| 07 | 2.4227: Use compressor air filters | $3,268 | $500 |
$3,268
26,780
kWh
|
- | - | |
| 08 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,548 | - |
$2,548
20,888
kWh
|
- | - | |
| 09 | 2.3512: De-energize excess transformer capacity | $1,248 | $760 |
$1,248
10,227
kWh
|
- | - | |
| TOTAL RECOMMENDED | $354,946 | $119,639 |
$132,446
1,144,651
kWh
|
$240,000
-
gal
|
$(-17,500.0)
-
lb
|
||
| TOTAL IMPLEMENTED | $236,566 | $102,720 |
$14,066
174,312
kWh
|
$240,000
-
gal
|
$(-17,500.0)
-
lb
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs