ITAC Assessment: RU0006
ITAC logo
ITAC Assessment: RU0006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product SILK SCREENING ON BOTTLE
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $1
M
to 5
M
# of Employees 52
Plant Area
n/a
Annual Production 100,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,166 1,441,090
kWh
Natural Gas $124,444 21,007
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,519 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 3.4154: Eliminate leaks in water lines and valves $4,140 $396 - $3,255
-
MMBtu
$885
02 2.2511: Insulate bare equipment $3,147 $648 - $3,147
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,672 - $2,672
33,411
kWh
- -
04 2.4312: Improve lubrication practices $832 - $832
10,551
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,154 $5,600 $5,154
64,478
kWh
- -
06 2.2441: Preheat boiler makeup water with waste process heat $8,856 $9,500 - $8,856
-
MMBtu
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $718 $1,204 $718
13,775
kWh
- -
TOTAL RECOMMENDED $25,519 $17,348 $9,376
122,215
kWh
$15,258
-
MMBtu
$885
TOTAL IMPLEMENTED $7,530 $1,600 $3,390
47,186
kWh
$3,255
-
MMBtu
$885
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs