ITAC Assessment: MI0321
ITAC logo
ITAC Assessment: MI0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Electric Coils and Valves
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3677: Electronic Coils, Transformers, and Other Inductors
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 23,500
ft2
Annual Production 961,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,042 456,280
kWh
Electricity Demand $23,927 2,512
kW-mo/yr
Electricity Fees $2,626 -
TOTAL YEARLY COSTS $105,596
RECOMMENDED SAVINGS* $58,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,636

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.2515: Use optimum thickness insulation $17,954 $21,920 $13,821
79,891
kWh
$4,133
-
kW-mo/yr
-
02 2.7425: Clean or color roof to reduce solar load $10,816 $7,589 $8,552
49,435
kWh
$2,264
-
kW-mo/yr
-
03 2.6218: Turn off equipment when not in use $7,233 $3,600 $7,233
41,808
kWh
- -
04 2.4322: Use or replace with energy efficient substitutes $6,777 $5,492 $5,217
30,157
kWh
$1,560
-
kW-mo/yr
-
05 2.8114: Change rate schedules or other changes in utility service $5,988 $6,400 - - $5,988
06 2.3212: Optimize plant power factor $3,370 $10,745 - $3,370
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,256 $1,660 $1,408
8,139
kWh
$848
-
kW-mo/yr
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,121 $1,508 $1,972
11,400
kWh
$149
-
kW-mo/yr
-
09 2.2511: Insulate bare equipment $1,612 $1,914 $1,298
5,694
kWh
$313
-
kW-mo/yr
-
10 2.7221: Lower temperature during the winter season and vice-versa $766 $400 $590
3,409
kWh
$176
-
kW-mo/yr
-
TOTAL RECOMMENDED $58,893 $61,228 $40,092
229,933
kWh
$12,813
-
kW-mo/yr
$5,988
TOTAL IMPLEMENTED $40,636 $37,083 $32,903
188,376
kWh
$7,734
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs