28
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Printed circuit boards | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0613 #05 Y:2006 | 05 | 2006 | Insulate bare equipment | $507 | $256 | |
| MA0613 #04 Y:2006 | 04 | 2006 | Replace electrically-operated equipment with fossil fuel equipment | $20,408 | $15,900 | |
| MA0613 #03 Y:2006 | 03 | 2006 | Utilize higher efficiency lamps and/or ballasts | $7,574 | $53,250 | |
| MA0613 #02 Y:2006 | 02 | 2006 | Replace existing hvac unit with high efficiency model | $15,346 | $54,617 | |
| MA0613 #01 Y:2006 | 01 | 2006 | Reduce ventilation air | $22,488 | $15,475 | |
| CO0597 #07 Y:2006 | 07 | 2006 | Install occupancy sensors | $90 | $390 | |
| CO0597 #06 Y:2006 | 06 | 2006 | Utilize higher efficiency lamps and/or ballasts | $630 | $850 | |
| CO0597 #05 Y:2006 | 05 | 2006 | Use solar heat to make electricty | $1,360 | $11,000 | |
| CO0597 #04 Y:2006 | 04 | 2006 | Utilize higher efficiency lamps and/or ballasts | $2,620 | $6,660 | |
| CO0597 #03 Y:2006 | 03 | 2006 | Utilize higher efficiency lamps and/or ballasts | $3,860 | $10,220 | |
| CO0597 #02 Y:2006 | 02 | 2006 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,820 | $140 | |
| CO0597 #01 Y:2006 | 01 | 2006 | Use / purchase optimum sized compressor | $4,720 | $19,200 | |
| OK0733 #07 Y:2006 | 07 | 2006 | Utilize higher efficiency lamps and/or ballasts | $442 | $1,360 | |
| OK0733 #06 Y:2006 | 06 | 2006 | Install occupancy sensors | $1,460 | $3,919 | |
| OK0733 #05 Y:2006 | 05 | 2006 | Utilize higher efficiency lamps and/or ballasts | $2,077 | $9,738 | |
| OK0733 #04 Y:2006 | 04 | 2006 | Begin a practice of predictive / preventative maintenance | $3,500 | - | |
| OK0733 #03 Y:2006 | 03 | 2006 | Lower temperature during the winter season and vice-versa | $1,003 | $980 | |
| OK0733 #02 Y:2006 | 02 | 2006 | Install occupancy sensors | $6,122 | $13,600 | |
| OK0733 #01 Y:2006 | 01 | 2006 | Reschedule plant operations or reduce load to avoid peaks | $3,333 | $5,000 | |
| AS0426 #09 Y:2006 | 09 | 2006 | Use solar heat to heat water | $3,172 | $14,400 |