ITAC Assessment: CO0597
ITAC logo
ITAC Assessment: CO0597
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Printed circuit boards
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 40,776
ft2
Annual Production 1,300,000
pieces
Production Hrs. Annual 4,862
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,765 1,927,997
kWh
Electricity Demand $101,380 7,003
kW-mo/yr
Electricity Fees $1,946 -
Natural Gas $23,098 2,029
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,450

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4226: Use / purchase optimum sized compressor $4,720 $19,200 $2,380
73,300
kWh
$2,340
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,820 $140 $990
30,400
kWh
$830
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,860 $10,220 $1,760
54,300
kWh
$1,660
-
kW-mo/yr
$50 $390
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,620 $6,660 $1,310
40,200
kWh
$1,470
-
kW-mo/yr
$10 $(-170.0)
05 2.9114: Use solar heat to make electricty $1,360 $11,000 $470
14,600
kWh
$890
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $630 $850 $100
3,000
kWh
$60
-
kW-mo/yr
$100 $370
07 2.7135: Install occupancy sensors $90 $390 $80
2,500
kWh
$10
-
kW-mo/yr
- -
TOTAL RECOMMENDED $15,100 $48,460 $7,090
218,300
kWh
$7,260
-
kW-mo/yr
$160 $590
TOTAL IMPLEMENTED $2,450 $990 $1,090
33,400
kWh
$890
-
kW-mo/yr
$100 $370
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs