ITAC Assessment: OK0733
ITAC logo
ITAC Assessment: OK0733
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Printed Circuit Boards
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 88,000
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,034 2,022,750
kWh
Electricity Demand $41,706 5,037
kW-mo/yr
Natural Gas $3,771 349
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,937 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,104

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,333 $5,000 - $3,333
-
kW-mo/yr
- -
02 2.7135: Install occupancy sensors $6,122 $13,600 $6,122
148,950
kWh
- - -
03 2.7221: Lower temperature during the winter season and vice-versa $1,003 $980 - - $1,003
-
MMBtu
-
04 4.611: Begin a practice of predictive / preventative maintenance $3,500 - - - - $3,500
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,077 $9,738 $2,077
19,219
kWh
- - -
06 2.7135: Install occupancy sensors $1,460 $3,919 $1,460
35,526
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $442 $1,360 $442
4,709
kWh
- - -
TOTAL RECOMMENDED $17,937 $34,597 $10,101
208,404
kWh
$3,333
-
kW-mo/yr
$1,003
-
MMBtu
$3,500
TOTAL IMPLEMENTED $11,104 $29,597 $10,101
208,404
kWh
- $1,003
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs