Assessment Year | 2006 |
---|---|
Principal Product | Printed Circuit Boards |
NAICS | 334412: Bare Printed Circuit Board Manufacturing |
SIC | 3672: Printed Circuit Boards |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
88,000
ft2
|
Annual Production | 50,000
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,034 | 2,022,750 |
kWh
|
$0.041 |
Electricity Demand | $41,706 | 5,037 |
kW-mo/yr
|
$8.28 |
Natural Gas | $3,771 | 349 |
MMBtu
|
$10.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,937 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,104 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $3,333 | $5,000 | - |
$3,333
-
kW-mo/yr
|
- | - | |
02 | 2.7135: Install occupancy sensors | $6,122 | $13,600 |
$6,122
148,950
kWh
|
- | - | - | |
03 | 2.7221: Lower temperature during the winter season and vice-versa | $1,003 | $980 | - | - |
$1,003
-
MMBtu
|
- | |
04 | 4.611: Begin a practice of predictive / preventative maintenance | $3,500 | - | - | - | - | $3,500 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,077 | $9,738 |
$2,077
19,219
kWh
|
- | - | - | |
06 | 2.7135: Install occupancy sensors | $1,460 | $3,919 |
$1,460
35,526
kWh
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $442 | $1,360 |
$442
4,709
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $17,937 | $34,597 |
$10,101
208,404
kWh
|
$3,333
-
kW-mo/yr
|
$1,003
-
MMBtu
|
$3,500 | ||
TOTAL IMPLEMENTED | $11,104 | $29,597 |
$10,101
208,404
kWh
|
- |
$1,003
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs