ITAC Assessment: MA0540
ITAC logo
ITAC Assessment: MA0540
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Plastic containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 105,000
ft2
Annual Production 8,400,000
pieces
Production Hrs. Annual 8,520
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,091,759 43,448,154
kWh
Electricity Demand $710,839 74,417
kW-mo/yr
Electricity Fees $3,833 -
Natural Gas $53,433 6,333
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,138,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,968

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $1,726,195 $11,884,320 $3,096,462
43,448,154
kWh
$710,839
-
kW-mo/yr
$(-2,194,856.0)
-
MMBtu
- $113,750
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $50,349 $28,595 $50,349
800,065
kWh
- - - -
03 2.2612: Use cooling tower water instead of refrigeration $32,261 $17,920 $32,261
470,966
kWh
- - - -
04 2.4221: Install compressor air intakes in coolest locations $12,447 $7,000 $12,447
181,700
kWh
- - - -
05 2.2628: Utilize a less expensive cooling method $10,042 $6,200 $10,042
146,600
kWh
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $295,995 $436,450 $259,385
3,787,000
kWh
$36,610
-
kW-mo/yr
- - -
07 2.7261: Install timers and/or thermostats $5,220 $650 $1,322
19,700
kWh
- $3,898
-
MMBtu
- -
08 2.4151: Develop a repair/replace policy $3,581 $5,497 $2,841
41,473
kWh
$740
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,968 $15,662 $234
3,400
kWh
$37
-
kW-mo/yr
- $1,697 -
TOTAL RECOMMENDED $2,138,058 $12,402,294 $3,465,343
48,899,058
kWh
$748,226
-
kW-mo/yr
$(-2,190,958.0)
-
MMBtu
$1,697 $113,750
TOTAL IMPLEMENTED $1,968 $15,662 $234
3,400
kWh
$37
-
kW-mo/yr
- $1,697 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs