Assessment Year | 1997 |
---|---|
Principal Product | road construction equipment |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
270,000
ft2
|
Annual Production | 250
pieces
|
Production Hrs. Annual | 5,460
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $87,797 | 3,063,013 |
kWh
|
$0.029 |
Electricity Demand | $96,135 | 10,260 |
kW-mo/yr
|
$9.37 |
Natural Gas | $59,913 | 15,060 |
MMBtu
|
$3.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $151,613 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $132,828 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.2121: Convert to electrostatic powder coating | $111,000 | $7,800 | - | - | - | - | $111,000 | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $20,790 | $71,000 | - | - |
$(-12,210.0)
-
MMBtu
|
$33,000 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,635 | $18,214 |
$3,661
121,923
kWh
|
$3,974
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,537 | $36,506 |
$3,631
201,641
kWh
|
$3,906
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,493 | $1,484 |
$787
26,084
kWh
|
$706
-
kW-mo/yr
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $775 | $204 |
$441
15,826
kWh
|
$334
-
kW-mo/yr
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,120 | $25 |
$1,198
39,859
kWh
|
$922
-
kW-mo/yr
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $263 | $500 |
$167
9,086
kWh
|
$96
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $151,613 | $135,733 |
$9,885
414,419
kWh
|
$9,938
-
kW-mo/yr
|
$(-12,210.0)
-
MMBtu
|
$33,000 | $111,000 | ||
TOTAL IMPLEMENTED | $132,828 | $79,504 |
$608
24,912
kWh
|
$430
-
kW-mo/yr
|
$(-12,210.0)
-
MMBtu
|
$33,000 | $111,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs