Assessment Year | 2019 |
---|---|
Principal Product | Prefabricated Wood Buildings and Homes |
NAICS | 321992: Prefabricated Wood Building Manufacturing |
SIC | 2452: Prefabricated Wood Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
32,000
ft2
|
Annual Production | 100
pieces
|
Production Hrs. Annual | 2,184
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $47,163 | 472,186 |
kWh
|
$0.100 |
Electricity Demand | $35,373 | 2,640 |
kW-mo/yr
|
$13.40 |
Electricity Fees | $2,434 | - |
|
- |
Fuel Oil #2 | $44,948 | 2,499 |
MMBtu
|
$17.99 |
TOTAL YEARLY COSTS | $129,918 | |||
RECOMMENDED SAVINGS* | $33,427 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,072 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.7314: Reduce ventilation air | $10,917 | $100 | - | - |
$10,917
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,356 | $9,356 |
$5,952
59,518
kWh
|
$3,404
-
kW-mo/yr
|
- | |
03 | 2.4226: Use / purchase optimum sized compressor | $6,808 | $17,300 |
$3,632
36,321
kWh
|
$3,176
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,547 | $10,850 |
$4,547
45,467
kWh
|
- | - | |
05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $1,241 | $5,413 | - | - |
$1,241
-
MMBtu
|
|
06 | 2.2136: Install / repair insulation on steam lines | $558 | $470 | - | - |
$558
-
MMBtu
|
|
TOTAL RECOMMENDED | $33,427 | $43,489 |
$14,131
141,306
kWh
|
$6,580
-
kW-mo/yr
|
$12,716
-
MMBtu
|
||
TOTAL IMPLEMENTED | $22,072 | $15,339 |
$5,952
59,518
kWh
|
$3,404
-
kW-mo/yr
|
$12,716
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs