ITAC Assessment: MA0807
ITAC logo
ITAC Assessment: MA0807
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Prefabricated Wood Buildings and Homes
NAICS 321992: Prefabricated Wood Building Manufacturing
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 32,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 2,184
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,163 472,186
kWh
Electricity Demand $35,373 2,640
kW-mo/yr
Electricity Fees $2,434 -
Fuel Oil #2 $44,948 2,499
MMBtu
TOTAL YEARLY COSTS $129,918
RECOMMENDED SAVINGS* $33,427 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,072

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.7314: Reduce ventilation air $10,917 $100 - - $10,917
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,356 $9,356 $5,952
59,518
kWh
$3,404
-
kW-mo/yr
-
03 2.4226: Use / purchase optimum sized compressor $6,808 $17,300 $3,632
36,321
kWh
$3,176
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,547 $10,850 $4,547
45,467
kWh
- -
05 2.7491: Insulate glazing, walls, ceilings, and roofs $1,241 $5,413 - - $1,241
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $558 $470 - - $558
-
MMBtu
TOTAL RECOMMENDED $33,427 $43,489 $14,131
141,306
kWh
$6,580
-
kW-mo/yr
$12,716
-
MMBtu
TOTAL IMPLEMENTED $22,072 $15,339 $5,952
59,518
kWh
$3,404
-
kW-mo/yr
$12,716
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs