| Assessment Year | 2002 |
|---|---|
| Principal Product | Corrugated paper |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
250,000
ft2
|
| Annual Production | 36,000
ton
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,393,058 | 20,056,800 |
kWh
|
$0.069 |
| Electricity Demand | $169,356 | 35,327 |
kW-mo/yr
|
$4.79 |
| Electricity Fees | $(-540.0) | - |
|
- |
| Natural Gas | $1,086,548 | 232,103 |
MMBtu
|
$4.68 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $1,161,166 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,709 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.4151: Minimize water usage | $32,733 | $25,000 | n/a |
$2,240
31,959
kWh
|
- |
$17,778
-
MMBtu
|
$12,715
-
Tgal
|
| 02 | 2.2437: Recover waste heat from equipment | $161,660 | $225,500 | - | - |
$161,660
-
MMBtu
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $59,990 | $26,000 | n/a | - | - |
$59,990
-
MMBtu
|
- |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $23,884 | $20,000 | n/a |
$23,884
340,837
kWh
|
- | - | - |
| 05 | 3.4111: Use closed cycle process to minimize waste water production | $19,687 | $55,000 |
$(-26,874.0)
340,837
kWh
|
- | - |
$46,561
-
Tgal
|
|
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,163 | $23,000 |
$5,628
80,307
kWh
|
$535
-
kW-mo/yr
|
- | - | |
| 07 | 2.2122: Install / repair insulation on condensate lines | $3,709 | $1,000 | - | - |
$3,709
-
MMBtu
|
- | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,677 | $9,000 |
$2,443
34,869
kWh
|
$234
-
kW-mo/yr
|
- | - | |
| 09 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $850,663 | $3,285,330 |
$979,003
19,674,300
kWh
|
- |
$(-128,340.0)
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $1,161,166 | $3,669,830 |
$986,324
20,503,109
kWh
|
$769
-
kW-mo/yr
|
$114,797
-
MMBtu
|
$59,276
-
Tgal
|
||
| TOTAL IMPLEMENTED | $3,709 | $1,000 | - | - |
$3,709
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs