ITAC Assessment: MA0522
ITAC logo
ITAC Assessment: MA0522
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Corrugated paper
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 250,000
ft2
Annual Production 36,000
ton
Production Hrs. Annual 8,568
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,393,058 20,056,800
kWh
Electricity Demand $169,356 35,327
kW-mo/yr
Electricity Fees $(-540.0) -
Natural Gas $1,086,548 232,103
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,161,166 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,709

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 3.4151: Minimize water usage $32,733 $25,000 n/a $2,240
31,959
kWh
- $17,778
-
MMBtu
$12,715
-
Tgal
02 2.2437: Recover waste heat from equipment $161,660 $225,500 - - $161,660
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $59,990 $26,000 n/a - - $59,990
-
MMBtu
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $23,884 $20,000 n/a $23,884
340,837
kWh
- - -
05 3.4111: Use closed cycle process to minimize waste water production $19,687 $55,000 $(-26,874.0)
340,837
kWh
- - $46,561
-
Tgal
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,163 $23,000 $5,628
80,307
kWh
$535
-
kW-mo/yr
- -
07 2.2122: Install / repair insulation on condensate lines $3,709 $1,000 - - $3,709
-
MMBtu
-
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,677 $9,000 $2,443
34,869
kWh
$234
-
kW-mo/yr
- -
09 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $850,663 $3,285,330 $979,003
19,674,300
kWh
- $(-128,340.0)
-
MMBtu
-
TOTAL RECOMMENDED $1,161,166 $3,669,830 $986,324
20,503,109
kWh
$769
-
kW-mo/yr
$114,797
-
MMBtu
$59,276
-
Tgal
TOTAL IMPLEMENTED $3,709 $1,000 - - $3,709
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs