3,330
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UL2513 #06 Y:2025 | 06 | 2025 | Install occupancy sensors | $602 | $2,234 |
n/a
|
UL2513 #05 Y:2025 | 05 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,723 | $561 |
n/a
|
UL2513 #04 Y:2025 | 04 | 2025 | Use solar heat to make electricty | $57,929 | $431,966 |
n/a
|
UL2513 #03 Y:2025 | 03 | 2025 | Use outside cold water source as a supply of cooling water | $34,574 | $58,425 |
n/a
|
UL2513 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,535 | $1,080 |
n/a
|
UL2513 #01 Y:2025 | 01 | 2025 | Reduce the pressure of compressed air to the minimum required | $1,366 | - |
n/a
|
NT0051 #06 Y:2025 | 06 | 2025 | Lower temperature during the winter season and vice-versa | $586 | - |
n/a
|
NT0051 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,986 | $5,609 |
n/a
|
NT0051 #04 Y:2025 | 04 | 2025 | Optimize plant power factor | $2,603 | $6,709 |
n/a
|
NT0051 #03 Y:2025 | 03 | 2025 | Reduce the pressure of compressed air to the minimum required | $12,814 | - |
n/a
|
NT0051 #02 Y:2025 | 02 | 2025 | Replace existing hvac unit with high efficiency model | $32,918 | $193,830 |
n/a
|
NT0051 #01 Y:2025 | 01 | 2025 | Reduce scrap production | $98,944 | $80,000 |
n/a
|
UC2509 #09 Y:2025 | 09 | 2025 | Utilize controls to operate equipment only when needed | $13,478 | $50 |
n/a
|
UC2509 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $29,692 | $9,100 |
n/a
|
UC2509 #07 Y:2025 | 07 | 2025 | Insulate bare equipment | $8,347 | $2,798 |
n/a
|
UC2509 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,269 | $1,190 |
n/a
|
UC2509 #05 Y:2025 | 05 | 2025 | Replace boiler | $42,258 | $132,297 |
n/a
|
UC2509 #04 Y:2025 | 04 | 2025 | Reduce the pressure of compressed air to the minimum required | $2,936 | $100 |
n/a
|
UC2509 #03 Y:2025 | 03 | 2025 | Optimize plant power factor | $19,546 | $32,370 |
n/a
|
UC2509 #02 Y:2025 | 02 | 2025 | Pay utility bills on time | $114 | - |
n/a
|