ITAC Assessment: DS0086
ITAC logo
ITAC Assessment: DS0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Computer Chips and Processors
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 650
Plant Area 250,000
ft2
Annual Production 71,550
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $788,457 26,771,689
kWh
Electricity Demand $370,595 49,212
kW-mo/yr
Electricity Fees $14,649 -
Natural Gas $237,922 70,070
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,602 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,761

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.3212: Optimize plant power factor $6,948 $3,808 - - $6,948 - - - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $960 - - - - $960
-
MMBtu
- - -
03 2.2511: Insulate bare equipment $1,477 $2,969 - - - $1,477
-
MMBtu
- - -
04 2.4221: Install compressor air intakes in coolest locations $1,631 $450 $1,387
47,773
kWh
$244
-
kW-mo/yr
- - - - -
05 3.8142: Distill contaminated solvents for reuse $14,841 $17,500 - - - - - $14,841
-
gal
-
06 3.4116: Meter recycled water (to reduce sewer charges) $17,888 $10,590 - - - - $17,888
-
Tgal
- -
07 2.8123: Pay utility bills on time $2,645 - - - - - - - $2,645
08 2.8121: Apply for tax-free status for energy purchases $16,212 $450 - - - - - - $16,212
TOTAL RECOMMENDED $62,602 $35,767 $1,387
47,773
kWh
$244
-
kW-mo/yr
$6,948 $2,437
-
MMBtu
$17,888
-
Tgal
$14,841
-
gal
$18,857
TOTAL IMPLEMENTED $47,761 $18,267 $1,387
47,773
kWh
$244
-
kW-mo/yr
$6,948 $2,437
-
MMBtu
$17,888
-
Tgal
- $18,857
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs