ITAC Assessment: DS0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Quartz Crystals and Frequency Control Components
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 32,000
ft2
Annual Production 5,200
pieces
Production Hrs. Annual 4,368
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,489 1,881,301
kWh
Electricity Demand $26,479 4,044
kW-mo/yr
Electricity Fees $5,327 -
Natural Gas $7,193 1,448
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,668 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,037

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,707 $13,320 $3,585
119,578
kWh
$2,122
-
kW-mo/yr
- - - -
02 2.4221: Install compressor air intakes in coolest locations $330 $300 $204
6,741
kWh
$126
-
kW-mo/yr
- - - -
03 2.2511: Insulate bare equipment $883 $692 - - $883
-
MMBtu
- - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $1,048 $38 - - - - $1,048
-
lb
-
05 3.4151: Minimize water usage $655 $520 - - $250
-
MMBtu
$270
-
Tgal
- $135
-
Tgal
06 3.4111: Use closed cycle process to minimize waste water production $7,045 $20,000 $(-2,476.0)
(-79,426)
kWh
$(-1,486.0)
-
kW-mo/yr
- $7,338
-
Tgal
- $3,669
-
Tgal
TOTAL RECOMMENDED $15,668 $34,870 $1,313
46,893
kWh
$762
-
kW-mo/yr
$1,133
-
MMBtu
$7,608
-
Tgal
$1,048
-
lb
$3,804
-
Tgal
TOTAL IMPLEMENTED $6,037 $13,620 $3,789
126,319
kWh
$2,248
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs