ITAC Assessment: WV0316
ITAC logo
ITAC Assessment: WV0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Orthopedic Supplies
NAICS 339113: Surgical Appliance and Supplies Manufacturing
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 140,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $349,628 6,048,941
kWh
Electricity Fees $4,991 -
Natural Gas $177,051 20,434
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,854

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2113: Repair or replace steam traps $10,848 $1,000 - $11,388
-
MMBtu
$(-540.0) -
02 2.6218: Turn off equipment when not in use $9,434 - $9,554
179,023
kWh
- $(-120.0) -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,222 - $5,222
88,941
kWh
- - -
04 2.2628: Utilize a less expensive cooling method $4,152 $2,375 $4,152
70,812
kWh
- - -
05 2.2437: Recover waste heat from equipment $3,816 $580 - $3,816
-
MMBtu
- -
06 2.2414: Use waste heat from hot flue gases to preheat $3,317 $1,705 - $3,317
-
MMBtu
- -
07 2.1233: Analyze flue gas for proper air/fuel ratio $3,199 $1,000 - $3,559
-
MMBtu
$(-360.0) -
08 2.7111: Reduce illumination to minimum necessary levels $2,722 - $994
16,960
kWh
- $1,080 $648
09 2.2625: Chill water to the highest temperature possible $2,491 $60 $2,491
42,487
kWh
- - -
10 2.2511: Insulate bare equipment $825 $141 $825
14,064
kWh
- - -
11 2.2511: Insulate bare equipment $783 $70 - $783
-
MMBtu
- -
12 2.4151: Develop a repair/replace policy $552 $345 $912
15,529
kWh
- $(-360.0) -
TOTAL RECOMMENDED $47,361 $7,276 $24,150
427,816
kWh
$22,863
-
MMBtu
$(-300.0) $648
TOTAL IMPLEMENTED $30,854 $2,616 $14,776
268,063
kWh
$15,730
-
MMBtu
$(-300.0) $648
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs