88
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Vehicular lighting equipment | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NV0043 #06 Y:1995 | 06 | 1995 | Reduce illumination to minimum necessary levels | $3,277 | $700 | |
| NV0043 #05 Y:1995 | 05 | 1995 | Install occupancy sensors | $231 | $259 | |
| NV0043 #04 Y:1995 | 04 | 1995 | Utilize higher efficiency lamps and/or ballasts | $3,536 | $2,050 | |
| NV0043 #03 Y:1995 | 03 | 1995 | Improve air circulation with destratification fans / other methods | $3,295 | $10,075 | |
| NV0043 #02 Y:1995 | 02 | 1995 | Recover waste heat from equipment | $563 | $553 | |
| NV0043 #01 Y:1995 | 01 | 1995 | Install compressor air intakes in coolest locations | $171 | $120 | |
| UD0451 #04 Y:1994 | 04 | 1994 | Replace electrically-operated equipment with fossil fuel equipment | $13,000 | $26,000 | |
| UD0451 #03 Y:1994 | 03 | 1994 | Make a practice of turning off lights when not needed | $6,981 | $4,440 | |
| UD0451 #02 Y:1994 | 02 | 1994 | Purchase gas directly from a contract gas supplier | $17,100 | - | |
| UD0451 #01 Y:1994 | 01 | 1994 | Avoid introducing hot, humid, or dirty air into hvac system | $11,837 | $2,000 | |
| TN0450 #06 Y:1991 | 06 | 1991 | Optimize plant power factor | $4,400 | $9,000 | |
| TN0450 #05 Y:1991 | 05 | 1991 | Reschedule plant operations or reduce load to avoid peaks | $11,058 | - | |
| TN0450 #04 Y:1991 | 04 | 1991 | Turn off equipment during breaks, reduce operating time | $706 | $890 | |
| TN0450 #03 Y:1991 | 03 | 1991 | Utilize higher efficiency lamps and/or ballasts | $414 | $316 | |
| TN0450 #02 Y:1991 | 02 | 1991 | Improve lubrication practices | $788 | $300 | |
| TN0450 #01 Y:1991 | 01 | 1991 | Install compressor air intakes in coolest locations | $1,646 | $860 | |
| WI0106 #12 Y:1990 | 12 | 1990 | Lower temperature during the winter season and vice-versa | $1,220 | - | |
| WI0106 #11 Y:1990 | 11 | 1990 | Reduce hot water temperature to the minimum required | $299 | - | |
| WI0106 #10 Y:1990 | 10 | 1990 | Utilize energy-efficient belts and other improved mechanisms | $383 | - | |
| WI0106 #09 Y:1990 | 09 | 1990 | Install storm windows and doors | $733 | $1,544 |