ITAC Assessment: TN0450
ITAC logo
ITAC Assessment: TN0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product FLASHERS,CIRCUIT BREAKER
NAICS
n/a
SIC 3647: Vehicular Lighting Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area
n/a
Annual Production 27,375,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $325,296 5,834,994
kWh
Natural Gas $18,889 3,105
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,012

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $1,646 $860 $1,646
29,601
kWh
-
02 2.4312: Improve lubrication practices $788 $300 $788
14,068
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $414 $316 $1,446
26,084
kWh
$(-1,032.0)
04 2.6212: Turn off equipment during breaks, reduce operating time $706 $890 $706
12,603
kWh
-
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $11,058 - $11,058
-
kWh
-
06 2.3212: Optimize plant power factor $4,400 $9,000 $4,400
-
kWh
-
TOTAL RECOMMENDED $19,012 $11,366 $20,044
82,356
kWh
$(-1,032.0)
TOTAL IMPLEMENTED $19,012 $11,366 $20,044
82,356
kWh
$(-1,032.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs