Assessment Year | 2019 |
---|---|
Principal Product | Asphalt and Aggregates |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $1 M to 5M |
# of Employees | 14 |
Plant Area |
250,000
ft2
|
Annual Production | 750,000
units
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $350,780 | 2,867,666 |
kWh
|
$0.12 |
Electricity Demand | $421,899 | 12,744 |
kW-mo/yr
|
$33.11 |
LPG | $390,252 | 47,351 |
MMBtu
|
$8.24 |
TOTAL YEARLY COSTS | $1,162,931 | |||
RECOMMENDED SAVINGS* | $269,081 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $246,832 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $1,151 | $1,194 | - | - |
$1,151
-
MMBtu
|
|
02 | 2.2511: Insulate bare equipment | $14,442 | $17,400 | - | - |
$14,442
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,924 | $11,386 |
$2,991
24,451
kWh
|
$3,933
-
kW-mo/yr
|
- | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,065 | $2,276 |
$460
3,764
kWh
|
$605
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $6,742 | $17,476 |
$1,857
15,184
kWh
|
$4,885
-
kW-mo/yr
|
- | |
06 | 2.9114: Use solar heat to make electricty | $238,757 | $1,300,334 |
$200,241
1,637,025
kWh
|
$38,516
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $269,081 | $1,350,066 |
$205,549
1,680,424
kWh
|
$47,939
-
kW-mo/yr
|
$15,593
-
MMBtu
|
||
TOTAL IMPLEMENTED | $246,832 | $1,312,914 |
$203,232
1,661,476
kWh
|
$42,449
-
kW-mo/yr
|
$1,151
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs