ITAC Assessment: SF0545
ITAC logo
ITAC Assessment: SF0545
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Asphalt and Aggregates
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 250,000
ft2
Annual Production 750,000
units
Production Hrs. Annual 2,600
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $350,780 2,867,666
kWh
Electricity Demand $421,899 12,744
kW-mo/yr
LPG $390,252 47,351
MMBtu
TOTAL YEARLY COSTS $1,162,931
RECOMMENDED SAVINGS* $269,081 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $246,832

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.2511: Insulate bare equipment $1,151 $1,194 - - $1,151
-
MMBtu
02 2.2511: Insulate bare equipment $14,442 $17,400 - - $14,442
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,924 $11,386 $2,991
24,451
kWh
$3,933
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,065 $2,276 $460
3,764
kWh
$605
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,742 $17,476 $1,857
15,184
kWh
$4,885
-
kW-mo/yr
-
06 2.9114: Use solar heat to make electricty $238,757 $1,300,334 $200,241
1,637,025
kWh
$38,516
-
kW-mo/yr
-
TOTAL RECOMMENDED $269,081 $1,350,066 $205,549
1,680,424
kWh
$47,939
-
kW-mo/yr
$15,593
-
MMBtu
TOTAL IMPLEMENTED $246,832 $1,312,914 $203,232
1,661,476
kWh
$42,449
-
kW-mo/yr
$1,151
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs