ITAC Assessment: UD0451
ITAC logo
ITAC Assessment: UD0451
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product automotive lighting
NAICS
n/a
SIC 3647: Vehicular Lighting Equipment
Sales Range $100
M
to 500
M
# of Employees 412
Plant Area 288,000
ft2
Annual Production 650,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,052,688 14,656,214
kWh
Natural Gas $82,251 15,794
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,918 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,937

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $11,837 $2,000 $11,837
172,919
kWh
- -
02 2.8113: Purchase gas directly from a contract gas supplier $17,100 - - - $17,100
03 2.7124: Make a practice of turning off lights when not needed $6,981 $4,440 $6,035
87,046
kWh
- $946
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $13,000 $26,000 $20,526
240,035
kWh
$(-6,826.0)
-
MMBtu
$(-700.0)
TOTAL RECOMMENDED $48,918 $32,440 $38,398
500,000
kWh
$(-6,826.0)
-
MMBtu
$17,346
TOTAL IMPLEMENTED $28,937 $2,000 $11,837
172,919
kWh
- $17,100
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs