Assessment Year | 2023 |
---|---|
Principal Product | Plastic wastewater filtering products |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
66,000
ft2
|
Annual Production | 325,000
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $30,949 | 299,360 |
kWh
|
$0.10 |
Electricity Demand | $38,103 | 1,666 |
kW-mo/yr
|
$22.87 |
Electricity Fees | $12,297 | - |
|
- |
Natural Gas | $37,249 | 2,761 |
MMBtu
|
$13.49 |
TOTAL YEARLY COSTS | $118,598 | |||
RECOMMENDED SAVINGS* | $85,547 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $20,054 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8123: Pay utility bills on time | $6 | - | - | - | $6 | - | - | |
02 | 2.8114: Change rate schedules or other changes in utility service | $2,483 | - | - | - | $2,483 | - | - | |
03 | 2.8114: Change rate schedules or other changes in utility service | $2,923 | - | - | - | $2,923 | - | - | |
04 | 2.8121: Apply for tax-free status for energy purchases | $9,833 | - | - | - | $9,833 | - | - | |
05 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $13,136 | $111,775 |
$807
7,800
kWh
|
$3,659
-
kW-mo/yr
|
$10,050 |
$(-1,379.7)
-
MMBtu
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $414 | $300 |
$178
1,720
kWh
|
$236
-
kW-mo/yr
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $510 | $1,300 |
$219
2,120
kWh
|
$291
-
kW-mo/yr
|
- | - | - | |
08 | 2.6231: Utilize controls to operate equipment only when needed | $173 | $30 |
$173
1,677
kWh
|
- | - | - | - | |
09 | 2.7232: Replace existing hvac unit with high efficiency model | $3,885 | $28,876 |
$(-11,049.7)
(-106,864)
kWh
|
$(-3,347.9)
-
kW-mo/yr
|
- |
$18,282
-
MMBtu
|
- | |
10 | 2.7234: Use heat pump for space conditioning | $25,926 | $115,275 |
$(-14,904.7)
(-144,146)
kWh
|
$3,589
-
kW-mo/yr
|
- |
$37,242
-
MMBtu
|
- | |
11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $9,248 | $43,351 |
$(-1,478.9)
(-14,303)
kWh
|
$(-448.1)
-
kW-mo/yr
|
- |
$11,175
-
MMBtu
|
- | |
12 | 2.9114: Use solar heat to make electricty | $17,010 | $126,560 |
$19,541
188,982
kWh
|
- | - | - | $(-2,531.0) | |
TOTAL RECOMMENDED | $85,547 | $427,467 |
$(-6,515.4)
(-63,015)
kWh
|
$3,979
-
kW-mo/yr
|
$25,295 |
$65,319
-
MMBtu
|
$(-2,531.0) | ||
TOTAL IMPLEMENTED | $20,054 | $30,476 |
$(-10,652.7)
(-103,024)
kWh
|
$(-2,821.0)
-
kW-mo/yr
|
$15,245 |
$18,282
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs