ITAC Assessment: UM0288
ITAC logo
ITAC Assessment: UM0288
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Silicone Products
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 32,000
ft2
Annual Production 14,100,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,810 2,568,289
kWh
Electricity Demand $71,733 7,410
kW-mo/yr
Electricity Fees $7,099 -
Natural Gas $9,099 1,556
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,942 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,776

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,386 $10,000 $2,896
83,741
kWh
$2,490
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,865 $150 $1,195
34,572
kWh
$670
-
kW-mo/yr
-
03 2.6231: Utilize controls to operate equipment only when needed $1,004 $400 $329
5,218
kWh
- $675
-
MMBtu
04 2.2437: Recover waste heat from equipment $895 $1,000 - - $895
-
MMBtu
05 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $656 - $656
18,928
kWh
- -
06 2.7314: Reduce ventilation air $616 $150 $616
9,477
kWh
- -
07 2.7124: Make a practice of turning off lights when not needed $159 $25 $60
1,723
kWh
$99
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $141 $300 $91
2,618
kWh
$50
-
kW-mo/yr
-
09 2.7444: Close holes and openings in building such as broken windows $130 $50 $13
200
kWh
- $117
-
MMBtu
10 2.7135: Install occupancy sensors $90 $600 $90
2,608
kWh
- -
TOTAL RECOMMENDED $10,942 $12,675 $5,946
159,085
kWh
$3,309
-
kW-mo/yr
$1,687
-
MMBtu
TOTAL IMPLEMENTED $9,776 $11,325 $5,842
156,267
kWh
$3,259
-
kW-mo/yr
$675
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs