ITAC Assessment: LE0569
ITAC logo
ITAC Assessment: LE0569
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Motor vehicle parts
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $1
M
to 5
M
# of Employees 56
Plant Area 101,750
ft2
Annual Production 18,800
units
Production Hrs. Annual 3,744
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $283,519 3,521,251
kWh
Electricity Demand $25,640 4,894
kW-mo/yr
Electricity Fees $2,967 -
Natural Gas $391,617 76,618
MMBtu
TOTAL YEARLY COSTS $703,743
RECOMMENDED SAVINGS* $28,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $4,637 - $2,973
36,708
kWh
$1,664
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,781 $400 $1,592
19,656
kWh
$189
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $92 $70 $92
1,138
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,033 $21,165 $18,398
227,136
kWh
$1,635
-
kW-mo/yr
-
05 2.2443: Re-use or recycle hot or cold process exhaust air $1,415 $1,500 - - $1,415
-
MMBtu
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $912 $1,400 $839
10,335
kWh
$73
-
kW-mo/yr
-
TOTAL RECOMMENDED $28,870 $24,535 $23,894
294,973
kWh
$3,561
-
kW-mo/yr
$1,415
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs