ITAC Assessment: AM0819
ITAC logo
ITAC Assessment: AM0819
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Beauty salon equipment & furniture
NAICS 333318: Other Commercial and Service Industry Machinery Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 170,000
ft2
Annual Production 28,000
pieces
Production Hrs. Annual 2,277
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,894 1,096,483
kWh
Electricity Demand $28,993 4,832
kW-mo/yr
Electricity Fees $1,473 -
Natural Gas $7,182 1,056
MMBtu
TOTAL YEARLY COSTS $107,542
RECOMMENDED SAVINGS* $9,755 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,510

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,370 $11,040 $2,890
45,400
kWh
$1,290
-
kW-mo/yr
$190
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,030 $1,000 $1,360
21,415
kWh
$670
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,710 $740 $1,710
26,900
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,535 $15 $1,025
16,110
kWh
$510
-
kW-mo/yr
-
05 2.7111: Reduce illumination to minimum necessary levels $60 $90 $45
730
kWh
$15
-
kW-mo/yr
-
06 2.6218: Turn off equipment when not in use $50 - $50
780
kWh
- -
TOTAL RECOMMENDED $9,755 $12,885 $7,080
111,335
kWh
$2,485
-
kW-mo/yr
$190
TOTAL IMPLEMENTED $6,510 $12,130 $4,345
68,325
kWh
$1,975
-
kW-mo/yr
$190
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs