Assessment Year | 1991 |
---|---|
Principal Product | AUTO LIGHTING LENSES |
NAICS |
n/a
|
SIC | 3647: Vehicular Lighting Equipment |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $630,024 | 9,152,697 |
kWh
|
$0.069 |
Natural Gas | $148,658 | 33,197 |
MMBtu
|
$4.48 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,680 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $32,440 | $10,800 |
$32,440
471,278
kWh
|
- | |
02 | 2.3191: Use demand controller or load shedder | $11,780 | $10,000 |
$11,780
-
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,727 | $3,515 |
$2,727
39,566
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $1,862 | $800 | - |
$1,862
-
MMBtu
|
|
05 | 2.6232: Install set-back timers | $1,351 | $600 |
$1,351
19,637
kWh
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,015 | $500 | - |
$1,015
-
MMBtu
|
|
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $958 | $1,000 |
$958
14,068
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $912 | $1,500 |
$912
13,189
kWh
|
- | |
09 | 2.7494: Install storm windows and doors | $733 | $1,544 | - |
$733
-
MMBtu
|
|
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $383 | - |
$383
5,569
kWh
|
- | |
11 | 2.6121: Reduce hot water temperature to the minimum required | $299 | - |
$299
4,396
kWh
|
- | |
12 | 2.7221: Lower temperature during the winter season and vice-versa | $1,220 | - | - |
$1,220
-
MMBtu
|
|
TOTAL RECOMMENDED | $55,680 | $30,259 |
$50,850
567,703
kWh
|
$4,830
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs