ITAC Assessment: NV0043
ITAC logo
ITAC Assessment: NV0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Aircraft Lighting Systems
NAICS
n/a
SIC 3647: Vehicular Lighting Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 150,000
ft2
Annual Production 28,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,206 1,616,354
kWh
Natural Gas $22,862 3,801
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,897

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $171 $120 $171
3,810
kWh
-
02 2.2437: Recover waste heat from equipment $563 $553 - $563
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $3,295 $10,075 - $3,295
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,536 $2,050 $3,536
44,256
kWh
-
05 2.7135: Install occupancy sensors $231 $259 $231
4,396
kWh
-
06 2.7111: Reduce illumination to minimum necessary levels $3,277 $700 $3,277
43,669
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $591 $200 $591
12,603
kWh
-
TOTAL RECOMMENDED $11,664 $13,957 $7,806
108,734
kWh
$3,858
-
MMBtu
TOTAL IMPLEMENTED $7,897 $11,648 $4,039
60,082
kWh
$3,858
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs