| Assessment Year | 1995 |
|---|---|
| Principal Product | Aircraft Lighting Systems |
| NAICS |
n/a
|
| SIC | 3647: Vehicular Lighting Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 250 |
| Plant Area |
150,000
ft2
|
| Annual Production | 28,000
pieces
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | Nevada |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $117,206 | 1,616,354 |
kWh
|
$0.073 |
| Natural Gas | $22,862 | 3,801 |
MMBtu
|
$6.01 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,664 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,897 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4221: Install compressor air intakes in coolest locations | $171 | $120 |
$171
3,810
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $563 | $553 | - |
$563
-
MMBtu
|
|
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $3,295 | $10,075 | - |
$3,295
-
MMBtu
|
|
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,536 | $2,050 |
$3,536
44,256
kWh
|
- | |
| 05 | 2.7135: Install occupancy sensors | $231 | $259 |
$231
4,396
kWh
|
- | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $3,277 | $700 |
$3,277
43,669
kWh
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $591 | $200 |
$591
12,603
kWh
|
- | |
| TOTAL RECOMMENDED | $11,664 | $13,957 |
$7,806
108,734
kWh
|
$3,858
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,897 | $11,648 |
$4,039
60,082
kWh
|
$3,858
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs