Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

195

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Commercial, industrial, and institutional electric lighting fixtures
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0284 #08 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $190 $379
IC0284 #07 Y:2023 Turn off equipment when not in use $415 -
IC0284 #06 Y:2023 Purchase equipment instead of leasing $192,600 $121,203
IC0284 #05 Y:2023 Use direct flame impingement or infrared processing for chamber type heating $152,337 $14,315
IC0284 #04 Y:2023 Insulate bare equipment $556 $897
IC0284 #03 Y:2023 Maintain air filters by cleaning or replacement $445 -
IC0284 #02 Y:2023 Eliminate or reduce compressed air usage $4,864 -
IC0284 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $6,480 $3,669
MZ0318 #06 Y:2021 Install partitions to reduce size of conditioned space $4,616 -
MZ0318 #05 Y:2021 Repair furnaces and oven doors so that they seal efficiently $168 $130
MZ0318 #04 Y:2021 Install vinyl strip / high speed / air curtain doors $29,334 $6,436
MZ0318 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $1,004 $200
MZ0318 #02 Y:2021 Reduce the pressure of compressed air to the minimum required $248 $320
MZ0318 #01 Y:2021 Install compressor air intakes in coolest locations $261 $1,600
AM0814 #08 Y:2020 Use synthetic lubricant $300 $200
AM0814 #07 Y:2020 Pay utility bills on time $490 -
AM0814 #06 Y:2020 Reduce the pressure of compressed air to the minimum required $500 $25
AM0814 #05 Y:2020 Establish a predictive maintenance program $1,470 $4,340
AM0814 #04 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $1,540 $1,000
AM0814 #03 Y:2020 Optimize plant power factor $6,460 $9,830