Assessment Year | 2021 |
---|---|
Principal Product | Custom lighting fixtures |
NAICS | 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing |
SIC | 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
51,124
ft2
|
Annual Production | 350,000
units
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $55,881 | 531,884 |
kWh
|
$0.11 | |
Natural Gas | $43,274 | 6,455 |
MMBtu
|
$6.70 | |
Waste Disposal Costs | |||||
Water Usage | $7,682 | 1,015 |
Tgal
|
$7.57 | |
TOTAL YEARLY COSTS | $106,837 | ||||
RECOMMENDED SAVINGS* | $35,631 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $35,631 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $261 | $1,600 |
$261
2,491
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $248 | $320 |
$248
2,359
kWh
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,004 | $200 |
$1,004
9,565
kWh
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $29,334 | $6,436 |
$(-177.0)
(-1,684)
kWh
|
$29,511
-
MMBtu
|
|
05 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $168 | $130 |
$86
822
kWh
|
$82
-
MMBtu
|
|
06 | 2.7496: Install partitions to reduce size of conditioned space | $4,616 | - |
$4,616
43,960
kWh
|
- | |
TOTAL RECOMMENDED | $35,631 | $8,686 |
$6,038
57,513
kWh
|
$29,593
-
MMBtu
|
||
TOTAL IMPLEMENTED | $35,631 | $8,686 |
$6,038
57,513
kWh
|
$29,593
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs