ITAC Assessment: MZ0318
ITAC logo
ITAC Assessment: MZ0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Custom lighting fixtures
NAICS 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 51,124
ft2
Annual Production 350,000
units
Production Hrs. Annual 2,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,881 531,884
kWh
Natural Gas $43,274 6,455
MMBtu
Waste Disposal Costs
Water Usage $7,682 1,015
Tgal
TOTAL YEARLY COSTS $106,837
RECOMMENDED SAVINGS* $35,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,631

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4221: Install compressor air intakes in coolest locations $261 $1,600 $261
2,491
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $248 $320 $248
2,359
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,004 $200 $1,004
9,565
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $29,334 $6,436 $(-177.0)
(-1,684)
kWh
$29,511
-
MMBtu
05 2.1135: Repair furnaces and oven doors so that they seal efficiently $168 $130 $86
822
kWh
$82
-
MMBtu
06 2.7496: Install partitions to reduce size of conditioned space $4,616 - $4,616
43,960
kWh
-
TOTAL RECOMMENDED $35,631 $8,686 $6,038
57,513
kWh
$29,593
-
MMBtu
TOTAL IMPLEMENTED $35,631 $8,686 $6,038
57,513
kWh
$29,593
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs