Assessment Year | 2000 |
---|---|
Principal Product | steel agricultural tillage tools |
NAICS |
n/a
|
SIC | 3523: Farm Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
144,000
ft2
|
Annual Production | 10,000
ton
|
Production Hrs. Annual | 3,600
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,955 | 2,942,556 |
kWh
|
$0.024 |
Electricity Demand | $127,083 | 9,708 |
kW-mo/yr
|
$13.09 |
Natural Gas | $134,287 | 58,196 |
MMBtu
|
$2.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,546 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,005 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.431: Train operators for maximum operating efficiency | $47,476 | - | - | - | $47,476 | - | - | |
02 | 4.514: Re-arrange equipment layout to reduce handling costs | $12,000 | $14,500 | - | - | - | $12,000 | - | |
03 | 4.322: Eliminate old stock and modify inventory control | $33,000 | $20,000 | - | - | $33,000 | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,349 | - |
$1,220
48,652
kWh
|
$2,129
-
kW-mo/yr
|
- | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,005 | $158 |
$728
29,015
kWh
|
$1,277
-
kW-mo/yr
|
- | - | - | |
06 | 4.211: Consider use / purchase of bulk materials where possible | $1,716 | $6 | - | - | - | - | $1,716 | |
TOTAL RECOMMENDED | $99,546 | $34,664 |
$1,948
77,667
kWh
|
$3,406
-
kW-mo/yr
|
$80,476 | $12,000 | $1,716 | ||
TOTAL IMPLEMENTED | $14,005 | $14,658 |
$728
29,015
kWh
|
$1,277
-
kW-mo/yr
|
- | $12,000 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs