ITAC Assessment: MZ0260
ITAC logo
ITAC Assessment: MZ0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product processed wastewater and sludge from sewage of City of Columbia, Missour
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 96
Plant Area 875,000
ft2
Annual Production 5,110,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $693,770 9,210,560
kWh
Electricity Demand $20,158 15,546
kW-mo/yr
Natural Gas $59,379 7,134
MMBtu
Waste Disposal Costs
Water Usage $6,887 1,466,828
Tgal
TOTAL YEARLY COSTS $780,193
RECOMMENDED SAVINGS* $82,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,411

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $21,384 $25,688 $20,835
277,794
kWh
$550
-
kW-mo/yr
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $577 $450 - - $577
-
MMBtu
-
03 2.7135: Install occupancy sensors $32,450 $7,600 $32,450
432,674
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $16,122 $23,576 $11,924
158,994
kWh
$283
-
kW-mo/yr
- $3,915
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $12,057 $59,524 $(-4,927.0)
(-65,700)
kWh
$(-117.0)
-
kW-mo/yr
$(-24,479.0)
-
MMBtu
$41,580
TOTAL RECOMMENDED $82,590 $116,838 $60,282
803,762
kWh
$716
-
kW-mo/yr
$(-23,902.0)
-
MMBtu
$45,495
TOTAL IMPLEMENTED $54,411 $33,738 $53,285
710,468
kWh
$550
-
kW-mo/yr
$577
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs