Assessment Year | 2018 |
---|---|
Principal Product | processed wastewater and sludge from sewage of City of Columbia, Missour |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 96 |
Plant Area |
875,000
ft2
|
Annual Production | 5,110,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $693,770 | 9,210,560 |
kWh
|
$0.075 | |
Electricity Demand | $20,158 | 15,546 |
kW-mo/yr
|
$1.30 | |
Natural Gas | $59,379 | 7,134 |
MMBtu
|
$8.32 | |
Waste Disposal Costs | |||||
Water Usage | $6,887 | 1,466,828 |
Tgal
|
$0.005 | |
TOTAL YEARLY COSTS | $780,193 | ||||
RECOMMENDED SAVINGS* | $82,590 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $54,411 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $21,384 | $25,688 |
$20,835
277,794
kWh
|
$550
-
kW-mo/yr
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $577 | $450 | - | - |
$577
-
MMBtu
|
- | |
03 | 2.7135: Install occupancy sensors | $32,450 | $7,600 |
$32,450
432,674
kWh
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $16,122 | $23,576 |
$11,924
158,994
kWh
|
$283
-
kW-mo/yr
|
- | $3,915 | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $12,057 | $59,524 |
$(-4,927.0)
(-65,700)
kWh
|
$(-117.0)
-
kW-mo/yr
|
$(-24,479.0)
-
MMBtu
|
$41,580 | |
TOTAL RECOMMENDED | $82,590 | $116,838 |
$60,282
803,762
kWh
|
$716
-
kW-mo/yr
|
$(-23,902.0)
-
MMBtu
|
$45,495 | ||
TOTAL IMPLEMENTED | $54,411 | $33,738 |
$53,285
710,468
kWh
|
$550
-
kW-mo/yr
|
$577
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs