ITAC Assessment: UC2503
ITAC logo
ITAC Assessment: UC2503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Electric Lighting Fixtures
NAICS 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 155,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,272 438,861
kWh
Electricity Demand $60,141 3,925
kW-mo/yr
Electricity Fees $1,025 -
Fuel Oil #1 $34,778 11,534
MMBtu
Fuel Oil #2 $55,031 31,799
MMBtu
TOTAL YEARLY COSTS $215,246
RECOMMENDED SAVINGS* $48,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.8123: Pay utility bills on time $115 - - - $115 -
02 2.8114: Change rate schedules or other changes in utility service $3,774 - - - $3,774 -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,369 $18,244 $4,731
32,292
kWh
$2,638
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,976 $75 $2,553
17,428
kWh
$1,423
-
kW-mo/yr
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,078 $1,600 $10,322
70,454
kWh
$5,757
-
kW-mo/yr
- -
06 2.4226: Use / purchase optimum sized compressor $15,917 $51,000 $10,218
69,750
kWh
$5,699
-
kW-mo/yr
- -
07 2.7261: Install timers and/or thermostats $531 $2,870 $531
3,627
kWh
- - -
08 2.7135: Install occupancy sensors $751 $435 $724
4,941
kWh
- - $27
TOTAL RECOMMENDED $48,513 $74,224 $29,079
198,491
kWh
$15,517
-
kW-mo/yr
$3,889 $27
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs