ITAC Assessment: CC0004
ITAC logo
ITAC Assessment: CC0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Commercial Lighting Fixtures
NAICS 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing
SIC 3646: Commercial, Industrial, and Institutional Electric Lighting Fixtures
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 70,000
ft2
Annual Production 40,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $234,886 3,288,000
kWh
Natural Gas $6,856 713
MMBtu
TOTAL YEARLY COSTS $241,742
RECOMMENDED SAVINGS* $55,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $2,215 - $2,215
31,200
kWh
-
02 2.2437: Recover waste heat from equipment $2,945 $10,000 $(-179.0)
(-2,518)
kWh
$3,124
-
MMBtu
03 2.9114: Use solar heat to make electricty $50,675 $312,900 $50,675
713,730
kWh
-
TOTAL RECOMMENDED $55,835 $322,900 $52,711
742,412
kWh
$3,124
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs