ITAC Assessment: OR0476
ITAC logo
ITAC Assessment: OR0476
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Door Skins
NAICS 321911: Wood Window and Door Manufacturing
SIC 2431: Millwork
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area 64,000
ft2
Annual Production 8,800,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,009,647 33,266,800
kWh
Electricity Demand $183,376 54,900
kW-mo/yr
Electricity Fees $40,360 -
Fuel Oil #2 $495,222 56,244
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,139,225 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,028

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 4.126: Install sensors to detect defects $59,097 $38,400 - - - $2,216 $56,881 -
02 4.652: Replace existing equipment with more suitable substitutes $1,039,000 $1,200,000 - - - - - $1,039,000
03 2.1231: Establish burner maintenance schedule for boilers $9,028 $600 - - $9,028
-
MMBtu
- - -
04 2.4322: Use or replace with energy efficient substitutes $32,100 $47,900 $27,100
891,900
kWh
$5,000
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $1,139,225 $1,286,900 $27,100
891,900
kWh
$5,000
-
kW-mo/yr
$9,028
-
MMBtu
$2,216 $56,881 $1,039,000
TOTAL IMPLEMENTED $9,028 $600 - - $9,028
-
MMBtu
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs