Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Automotive Stampings
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area 40,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $122,762 1,279,826
kWh
Electricity Fees $(-6,847.0) -
Natural Gas $8,311 1,698
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,610 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,181 $750 $11,181
123,458
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,809 $5,500 $3,657
40,375
kWh
$(-848.0)
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,040 $6,081 $2,040
22,520
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,500 $4,000 - $1,500
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $80 - $80
881
kWh
-
TOTAL RECOMMENDED $17,610 $16,331 $16,958
187,234
kWh
$652
-
MMBtu
TOTAL IMPLEMENTED - - - -