Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product electronic controls for gas appliances
NAICS
n/a
SIC 3822: Automatic Controls for Regulating Residential and Commercial Environments and Appliances
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 22,000
ft2
Annual Production 260,000
pieces
Production Hrs. Annual 2,990
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,595 476,846
kWh
Electricity Demand $12,189 1,436
kW-mo/yr
Electricity Fees $120 -
Natural Gas $4,672 1,224
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $329,678 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $329,388

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings Increase in Production Savings
01 2.7224: Reduce space conditioning during non-working hours $4,000 $1,170 $1,500
52,462
kWh
- $2,500
-
MMBtu
- - - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,200 $240 $550
19,343
kWh
$650
-
kW-mo/yr
- - - - - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $358 $403 $230
8,206
kWh
$128
-
kW-mo/yr
- - - - - - -
04 2.4221: Install compressor air intakes in coolest locations $290 $420 $130
4,689
kWh
$160
-
kW-mo/yr
- - - - - - -
05 3.8132: Use less toxic and volatile solvent substitutes $201,090 $3,970 $490
17,292
kWh
- - $140
-
gal
- $5,460 - - $195,000
06 3.8121: Cover containers to minimize evaporative losses $9,120 $10,000 - - - $840
-
gal
- - $8,280 - -
07 3.6192: Use a less expensive method of waste removal $400 - - - - - $400
-
lb
- - - -
08 4.112: Replace old machine with new automatic multi-station tool $113,220 $25,000 $(-1,780.0)
(-62,427)
kWh
- - - - $(-80,000.0) - $195,000 -
TOTAL RECOMMENDED $329,678 $41,203 $1,120
39,565
kWh
$938
-
kW-mo/yr
$2,500
-
MMBtu
$980
-
gal
$400
-
lb
$(-74,540.0) $8,280 $195,000 $195,000
TOTAL IMPLEMENTED $329,388 $40,783 $990
34,876
kWh
$778
-
kW-mo/yr
$2,500
-
MMBtu
$980
-
gal
$400
-
lb
$(-74,540.0) $8,280 $195,000 $195,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs