ITAC Assessment: LE0530
ITAC logo
ITAC Assessment: LE0530
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Injected Molded Containers
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 90,000
ft2
Annual Production 300,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $531,665 5,614,650
kWh
Electricity Demand $81,369 12,725
kW-mo/yr
Electricity Fees $92,486 -
Natural Gas $33,194 2,448
MMBtu
TOTAL YEARLY COSTS $738,714
RECOMMENDED SAVINGS* $107,396 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7261: Install timers and/or thermostats $6,342 $1,840 $6,342
66,754
kWh
-
02 2.7232: Replace existing hvac unit with high efficiency model $84,060 $56,000 $76,950
812,448
kWh
$7,110
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,986 $5,500 $4,414
46,468
kWh
$572
-
kW-mo/yr
04 2.4221: Install compressor air intakes in coolest locations $3,313 $6,000 $2,934
30,880
kWh
$379
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $8,695 $17,000 $7,699
81,043
kWh
$996
-
kW-mo/yr
TOTAL RECOMMENDED $107,396 $86,340 $98,339
1,037,593
kWh
$9,057
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs