ITAC Assessment: SJ0039
ITAC logo
ITAC Assessment: SJ0039
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Liquid painting, powder coating, silk screening
NAICS 325510: Paint and Coating Manufacturing
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 43,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,854 413,809
kWh
Electricity Demand $49,225 2,303
kW-mo/yr
Natural Gas $147,448 7,371
MMBtu
LPG $1,236 43
MMBtu
TOTAL YEARLY COSTS $308,763
RECOMMENDED SAVINGS* $137,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $39,455 $171,206 $37,421
139,629
kWh
$2,034
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,291 - $11,748
43,837
kWh
$2,543
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $7,039 $28,758 $4,881
18,211
kWh
$2,158
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $5,502 $3,262 $1,215
4,536
kWh
$4,287
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,430 $15,514 $5,154
19,239
kWh
$2,276
-
kW-mo/yr
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $48,587 $3,938 $(-1,513.0)
(-5,646)
kWh
- $50,100
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $758 - $630
2,351
kWh
$128
-
kW-mo/yr
-
08 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,332 $4,500 $712
2,655
kWh
$620
-
kW-mo/yr
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $731 $114 $517
1,929
kWh
$214
-
kW-mo/yr
-
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,653 $10,067 $8,785
32,780
kWh
$3,868
-
kW-mo/yr
-
TOTAL RECOMMENDED $137,778 $237,359 $69,550
259,521
kWh
$18,128
-
kW-mo/yr
$50,100
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs