1,302
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WV0700 #09 Y:2026 | 09 | 2026 | Reduce the pressure of compressed air to the minimum required | $496 | $600 |
n/a
|
| WV0700 #08 Y:2026 | 08 | 2026 | Eliminate or reduce compressed air usage | $797 | $1,958 |
n/a
|
| WV0700 #07 Y:2026 | 07 | 2026 | Upgrade controls on compressors | $1,012 | $3,260 |
n/a
|
| WV0700 #06 Y:2026 | 06 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $1,452 | $3,984 |
n/a
|
| WV0700 #05 Y:2026 | 05 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $3,297 | $700 |
n/a
|
| WV0700 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,922 | $441 |
n/a
|
| WV0700 #03 Y:2026 | 03 | 2026 | Install occupancy sensors | $6,781 | $4,160 |
n/a
|
| WV0700 #02 Y:2026 | 02 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $6,816 | $7,000 |
n/a
|
| WV0700 #01 Y:2026 | 01 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $22,299 | $86,100 |
n/a
|
| MS0452 #03 Y:2025 | 03 | 2025 | Condense operation into one building | $26,400 | $60,000 | |
| MS0452 #02 Y:2025 | 02 | 2025 | Use / purchase optimum sized compressor | $2,035 | $20,549 | |
| MS0452 #01 Y:2025 | 01 | 2025 | Change procedures / equipment / operating conditions | $40,000 | $43,390 | |
| UC2512 #06 Y:2025 | 06 | 2025 | Begin a practice of predictive / preventative maintenance | $1,009 | $840 |
n/a
|
| UC2512 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,912 | $2,380 |
n/a
|
| UC2512 #04 Y:2025 | 04 | 2025 | Reduce the pressure of compressed air to the minimum required | $18,345 | $300 |
n/a
|
| UC2512 #03 Y:2025 | 03 | 2025 | Install compressor air intakes in coolest locations | $2,813 | $2,200 |
n/a
|
| UC2512 #02 Y:2025 | 02 | 2025 | Use or replace with energy efficient substitutes | $3,537 | $30,000 |
n/a
|
| UC2512 #01 Y:2025 | 01 | 2025 | Replace hydraulic / pneumatic equipment with electric equipment | $19,815 | $143,127 |
n/a
|
| WM0246 #03 Y:2025 | 03 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,267 | $1,081 | |
| WM0246 #02 Y:2025 | 02 | 2025 | Recharge batteries on during off-peak demand periods | $6,226 | - |