Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,270

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electric lighting and wiring equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1133 #07 Y:2024 Conserve energy by efficient use of vending machines $819 $480
OK1133 #06 Y:2024 Use radiant heater for spot heating $10,095 $25,179
OK1133 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $10,253 $7,180
OK1133 #04 Y:2024 Install sub-metering equipment $677 $990
OK1133 #03 Y:2024 Optimize plant power factor $5,711 $4,416
OK1133 #02 Y:2024 Use solar heat to make electricty $23,461 $163,800
OK1133 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $878 $1,370
CI0037 #14 Y:2024 Use most efficient type of electric motors $1,215 $740
CI0037 #13 Y:2024 Use / purchase optimum sized compressor $2,023 $18,000
CI0037 #12 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,140 $860
CI0037 #11 Y:2024 Use photocell controls $2,356 $960
CI0037 #10 Y:2024 Replace fossil fuel equipment with electrical equipment $2,495 $16,000
CI0037 #09 Y:2024 Install occupancy sensors $3,616 $1,575
CI0037 #08 Y:2024 Recharge batteries on during off-peak demand periods $4,373 $50
CI0037 #07 Y:2024 Convert to high volume low pressure (hvlp) paint guns $4,500 $2,000
CI0037 #06 Y:2024 Recover and reuse waste material $9,133 $8,750
CI0037 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $9,720 $13,500
CI0037 #04 Y:2024 Insulate bare equipment $11,559 $3,600
CI0037 #03 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $20,579 $1,600
CI0037 #02 Y:2024 Use solar heat to make electricty $35,594 $236,068