1,224
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
IC0284 #08 Y:2023 | 08 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $190 | $379 | |
IC0284 #07 Y:2023 | 07 | 2023 | Turn off equipment when not in use | $415 | - | |
IC0284 #06 Y:2023 | 06 | 2023 | Purchase equipment instead of leasing | $192,600 | $121,203 | |
IC0284 #05 Y:2023 | 05 | 2023 | Use direct flame impingement or infrared processing for chamber type heating | $152,337 | $14,315 | |
IC0284 #04 Y:2023 | 04 | 2023 | Insulate bare equipment | $556 | $897 | |
IC0284 #03 Y:2023 | 03 | 2023 | Maintain air filters by cleaning or replacement | $445 | - | |
IC0284 #02 Y:2023 | 02 | 2023 | Eliminate or reduce compressed air usage | $4,864 | - | |
IC0284 #01 Y:2023 | 01 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,480 | $3,669 | |
NT0013 #07 Y:2023 | 07 | 2023 | Change procedures / equipment / operating conditions | $720,000 | $120,000 | |
NT0013 #06 Y:2023 | 06 | 2023 | Lower temperature during the winter season and vice-versa | $1,102 | - | |
NT0013 #05 Y:2023 | 05 | 2023 | Adjust / maintain fork lift trucks for most efficient operation | $17,430 | $54,000 | |
NT0013 #04 Y:2023 | 04 | 2023 | Clean or color roof to reduce solar load | $49,000 | $83,421 | |
NT0013 #03 Y:2023 | 03 | 2023 | Optimize plant power factor | $10,076 | $5,043 | |
NT0013 #02 Y:2023 | 02 | 2023 | Utilize higher efficiency lamps and/or ballasts | $3,755 | $21,512 | |
NT0013 #01 Y:2023 | 01 | 2023 | Upgrade controls on compressors | $71,747 | $106,919 | |
KS2312 #07 Y:2023 | 07 | 2023 | Use solar heat to make electricty | $53,134 | $373,105 | |
KS2312 #06 Y:2023 | 06 | 2023 | Replace existing hvac unit with high efficiency model | $8,286 | $62,649 | |
KS2312 #05 Y:2023 | 05 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $80 | $89 | |
KS2312 #04 Y:2023 | 04 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,944 | $5,480 | |
KS2312 #03 Y:2023 | 03 | 2023 | Turn off equipment during breaks, reduce operating time | $2,204 | - |