Assessment Year | 2024 |
---|---|
Principal Product | Lighting Fixtures |
NAICS | 335121: Residential Electric Lighting Fixture Manufacturing |
SIC | 3645: Residential Electric Lighting Fixtures |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
75,000
ft2
|
Annual Production | 1,000,000
units
|
Production Hrs. Annual | 2,754
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $60,579 | 491,958 |
kWh
|
$0.12 | |
Electricity Demand | $89,601 | 2,459 |
kW-mo/yr
|
$36.44 | |
Electricity Fees | $11,806 | - |
|
- | |
Natural Gas | $3,351 | 216 |
MMBtu
|
$15.51 | |
LPG | $7,312 | 845 |
MMBtu
|
$8.65 | |
Waste Disposal Costs | |||||
Water Usage | $747 | 217 |
Tgal
|
$3.44 | |
Water Disposal | $179 | 217 |
Tgal
|
$0.82 | |
Other Liquid (non-haz) | $7,500 | 100 |
gal
|
$75.00 | |
Solid Waste (non-haz) | $100,000 | 200,000 |
lb
|
$0.50 | |
TOTAL YEARLY COSTS | $281,075 | ||||
RECOMMENDED SAVINGS* | $184,070 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4323: Use optimum size and capacity equipment | $74,767 | $25,940 |
$7,267
59,034
kWh
|
- | - | - | - | - | - | $67,500 | |
02 | 2.9114: Use solar heat to make electricty | $35,594 | $236,068 |
$25,852
210,007
kWh
|
$9,742
-
kW-mo/yr
|
- | - | - | - | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,579 | $1,600 |
$9,330
75,579
kWh
|
$11,249
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 2.2511: Insulate bare equipment | $11,559 | $3,600 |
$11,559
93,900
kWh
|
- | - | - | - | - | - | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,720 | $13,500 |
$4,400
35,741
kWh
|
$5,320
-
kW-mo/yr
|
- | - | - | - | - | - | |
06 | 3.5311: Recover and reuse waste material | $9,133 | $8,750 | - | - | - | - |
$9,133
-
lb
|
- | - | - | |
07 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $4,500 | $2,000 | - | - | - |
$4,500
-
gal
|
- | - | - | - | |
08 | 2.3132: Recharge batteries on during off-peak demand periods | $4,373 | $50 | - |
$4,373
-
kW-mo/yr
|
- | - | - | - | - | - | |
09 | 2.7135: Install occupancy sensors | $3,616 | $1,575 |
$2,002
16,264
kWh
|
$1,614
-
kW-mo/yr
|
- | - | - | - | - | - | |
10 | 2.1321: Replace fossil fuel equipment with electrical equipment | $2,495 | $16,000 |
$(-2,718.0)
(-22,080)
kWh
|
$(-2,099.0)
-
kW-mo/yr
|
$7,312
-
MMBtu
|
- | - | - | - | - | |
11 | 2.7134: Use photocell controls | $2,356 | $960 |
$425
3,454
kWh
|
$1,828
-
kW-mo/yr
|
- | - | - | $47 | $56 | - | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,140 | $860 |
$934
7,591
kWh
|
$1,206
-
kW-mo/yr
|
- | - | - | - | - | - | |
13 | 2.4226: Use / purchase optimum sized compressor | $2,023 | $18,000 |
$2,023
16,436
kWh
|
- | - | - | - | - | - | - | |
14 | 2.4133: Use most efficient type of electric motors | $1,215 | $740 |
$634
5,152
kWh
|
$581
-
kW-mo/yr
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $184,070 | $329,643 |
$61,708
501,078
kWh
|
$33,814
-
kW-mo/yr
|
$7,312
-
MMBtu
|
$4,500
-
gal
|
$9,133
-
lb
|
$47 | $56 | $67,500 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs