ITAC Assessment: CI0037
ITAC logo
ITAC Assessment: CI0037
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Lighting Fixtures
NAICS 335121: Residential Electric Lighting Fixture Manufacturing
SIC 3645: Residential Electric Lighting Fixtures
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 75,000
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 2,754
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,579 491,958
kWh
Electricity Demand $89,601 2,459
kW-mo/yr
Electricity Fees $11,806 -
Natural Gas $3,351 216
MMBtu
LPG $7,312 845
MMBtu
Waste Disposal Costs
Water Usage $747 217
Tgal
Water Disposal $179 217
Tgal
Other Liquid (non-haz) $7,500 100
gal
Solid Waste (non-haz) $100,000 200,000
lb
TOTAL YEARLY COSTS $281,075
RECOMMENDED SAVINGS* $184,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.4323: Use optimum size and capacity equipment $74,767 $25,940 $7,267
59,034
kWh
- - - - - - $67,500
02 2.9114: Use solar heat to make electricty $35,594 $236,068 $25,852
210,007
kWh
$9,742
-
kW-mo/yr
- - - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,579 $1,600 $9,330
75,579
kWh
$11,249
-
kW-mo/yr
- - - - - -
04 2.2511: Insulate bare equipment $11,559 $3,600 $11,559
93,900
kWh
- - - - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,720 $13,500 $4,400
35,741
kWh
$5,320
-
kW-mo/yr
- - - - - -
06 3.5311: Recover and reuse waste material $9,133 $8,750 - - - - $9,133
-
lb
- - -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,500 $2,000 - - - $4,500
-
gal
- - - -
08 2.3132: Recharge batteries on during off-peak demand periods $4,373 $50 - $4,373
-
kW-mo/yr
- - - - - -
09 2.7135: Install occupancy sensors $3,616 $1,575 $2,002
16,264
kWh
$1,614
-
kW-mo/yr
- - - - - -
10 2.1321: Replace fossil fuel equipment with electrical equipment $2,495 $16,000 $(-2,718.0)
(-22,080)
kWh
$(-2,099.0)
-
kW-mo/yr
$7,312
-
MMBtu
- - - - -
11 2.7134: Use photocell controls $2,356 $960 $425
3,454
kWh
$1,828
-
kW-mo/yr
- - - $47 $56 -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $2,140 $860 $934
7,591
kWh
$1,206
-
kW-mo/yr
- - - - - -
13 2.4226: Use / purchase optimum sized compressor $2,023 $18,000 $2,023
16,436
kWh
- - - - - - -
14 2.4133: Use most efficient type of electric motors $1,215 $740 $634
5,152
kWh
$581
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $184,070 $329,643 $61,708
501,078
kWh
$33,814
-
kW-mo/yr
$7,312
-
MMBtu
$4,500
-
gal
$9,133
-
lb
$47 $56 $67,500
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs