Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

99

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Electric and gas welding and soldering equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0258 #04 Y:2022 Use most efficient type of electric motors $4,997 $3,655
IC0258 #03 Y:2022 Install occupancy sensors $217 $247
IC0258 #02 Y:2022 Utilize higher efficiency lamps and/or ballasts $766 $1,297
IC0258 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $875 $50
CL2106 #04 Y:2021 Utilize daylight whenever possible in lieu of artificial light $40 $160
CL2106 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $3,356 $2,100
CL2106 #02 Y:2021 Install occupancy sensors $4,370 $5,425
CL2106 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $12,735 $6,460
MI0373 #07 Y:2020 Install occupancy sensors $176 $480
MI0373 #06 Y:2020 Eliminate leaks in inert gas and compressed air lines/ valves $3,264 $1,980
MI0373 #05 Y:2020 Use / purchase optimum sized compressor $3,315 $27,047
MI0373 #04 Y:2020 Install soft-start to eliminate nuisance trips $3,395 $1,470
MI0373 #03 Y:2020 Clean or color roof to reduce solar load $5,501 $16,518
MI0373 #02 Y:2020 Utilize higher efficiency lamps and/or ballasts $6,444 $25,685
MI0373 #01 Y:2020 Install vinyl strip / high speed / air curtain doors $8,619 $1,840
MI0199 #08 Y:2010 Use optimum size and capacity equipment $4,552 $4,531
MI0199 #07 Y:2010 Utilize higher efficiency lamps and/or ballasts $7,254 $5,975
MI0199 #06 Y:2010 Insulate bare equipment $8,626 $1,786
MI0199 #05 Y:2010 Eliminate or reduce compressed air usage $9,954 $2,200
MI0199 #04 Y:2010 Install vinyl strip / high speed / air curtain doors $10,308 $7,450