ITAC Assessment: IC0258
ITAC logo
ITAC Assessment: IC0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Solder and Flux
NAICS 333992: Welding and Soldering Equipment Manufacturing
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $10
M
to 50
M
# of Employees 30
Plant Area 60,000
ft2
Annual Production 310,454
units
Production Hrs. Annual 3,900
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,437 1,722,081
kWh
Electricity Demand $67,078 9,101
kW-mo/yr
Natural Gas $43,981 7,583
MMBtu
TOTAL YEARLY COSTS $207,495
RECOMMENDED SAVINGS* $6,854 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $875 $50 $623
11,116
kWh
$252
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $766 $1,297 $545
9,735
kWh
$220
-
kW-mo/yr
03 2.7135: Install occupancy sensors $217 $247 $154
2,752
kWh
$63
-
kW-mo/yr
04 2.4133: Use most efficient type of electric motors $4,997 $3,655 $3,557
63,516
kWh
$1,440
-
kW-mo/yr
TOTAL RECOMMENDED $6,854 $5,249 $4,879
87,119
kWh
$1,975
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs