ITAC Assessment: MI0373
ITAC logo
ITAC Assessment: MI0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Welding Tools
NAICS 333992: Welding and Soldering Equipment Manufacturing
SIC 3548: Electric and Gas Welding and Soldering Equipment
Sales Range $10
M
to 50
M
# of Employees 247
Plant Area 125,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,834 1,766,160
kWh
Electricity Demand $89,762 6,610
kW-mo/yr
Electricity Fees $31,721 -
TOTAL YEARLY COSTS $199,317
RECOMMENDED SAVINGS* $30,714 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,898

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $8,619 $1,840 $4,518
102,673
kWh
$4,101
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,444 $25,685 $2,506
56,964
kWh
$3,938
-
kW-mo/yr
03 2.7425: Clean or color roof to reduce solar load $5,501 $16,518 $1,617
36,750
kWh
$3,884
-
kW-mo/yr
04 2.4112: Install soft-start to eliminate nuisance trips $3,395 $1,470 - $3,395
-
kW-mo/yr
05 2.4226: Use / purchase optimum sized compressor $3,315 $27,047 $1,740
39,549
kWh
$1,575
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,264 $1,980 $1,825
41,484
kWh
$1,439
-
kW-mo/yr
07 2.7135: Install occupancy sensors $176 $480 $176
4,002
kWh
-
TOTAL RECOMMENDED $30,714 $75,020 $12,382
281,422
kWh
$18,332
-
kW-mo/yr
TOTAL IMPLEMENTED $21,898 $31,455 $9,025
205,123
kWh
$12,873
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs