ITAC Assessment: SD0462
ITAC logo
ITAC Assessment: SD0462
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Aircraft Components
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 1,133,000
ft2
Annual Production 1,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,531,006 23,340,626
kWh
Electricity Demand $965,798 47,702
kW-mo/yr
Electricity Fees $135,644 -
Natural Gas $450,068 106,502
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $187,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4134: Replace electric motor with fossil fuel engine $99,584 $283,600 $92,384
1,408,293
kWh
$74,888
-
kW-mo/yr
$(-67,688.0)
-
MMBtu
02 2.4133: Use most efficient type of electric motors $21,686 $36,750 $15,734
239,833
kWh
$5,952
-
kW-mo/yr
-
03 2.2414: Use waste heat from hot flue gases to preheat $19,741 $18,500 - - $19,741
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $16,726 $2,000 $9,238
140,830
kWh
$7,488
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,368 $32,235 $10,996
167,621
kWh
$2,372
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $12,034 $20,023 $8,400
128,049
kWh
$3,634
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $2,503 $4,225 $2,503
38,162
kWh
- -
08 2.4221: Install compressor air intakes in coolest locations $1,732 $2,035 $1,363
20,777
kWh
$369
-
kW-mo/yr
-
TOTAL RECOMMENDED $187,374 $399,368 $140,618
2,143,565
kWh
$94,703
-
kW-mo/yr
$(-47,947.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs