Assessment Year | 2013 |
---|---|
Principal Product | Aircraft Components |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
1,133,000
ft2
|
Annual Production | 1,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,531,006 | 23,340,626 |
kWh
|
$0.066 |
Electricity Demand | $965,798 | 47,702 |
kW-mo/yr
|
$20.25 |
Electricity Fees | $135,644 | - |
|
- |
Natural Gas | $450,068 | 106,502 |
MMBtu
|
$4.23 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $187,374 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4134: Replace electric motor with fossil fuel engine | $99,584 | $283,600 |
$92,384
1,408,293
kWh
|
$74,888
-
kW-mo/yr
|
$(-67,688.0)
-
MMBtu
|
|
02 | 2.4133: Use most efficient type of electric motors | $21,686 | $36,750 |
$15,734
239,833
kWh
|
$5,952
-
kW-mo/yr
|
- | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $19,741 | $18,500 | - | - |
$19,741
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $16,726 | $2,000 |
$9,238
140,830
kWh
|
$7,488
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,368 | $32,235 |
$10,996
167,621
kWh
|
$2,372
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,034 | $20,023 |
$8,400
128,049
kWh
|
$3,634
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $2,503 | $4,225 |
$2,503
38,162
kWh
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,732 | $2,035 |
$1,363
20,777
kWh
|
$369
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $187,374 | $399,368 |
$140,618
2,143,565
kWh
|
$94,703
-
kW-mo/yr
|
$(-47,947.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs